Typical projects of schools at 1100,500 seats. School projects

Construction project agreed general education school At 1100 places in the rural settlement, the Sosken Novomoskovsky district of the capital.

The territory of construction of 3.4 hectares is located in the southern part of the communark village. The construction of a secondary school, a device of travel, platforms, sidewalks, a metal fencing of 2.5 m high, placement of the platform for recreation, physical culture and playgrounds, as well as the landscaping of the territory is envisaged.

"In accordance with the approved project, the school building consists of 4 blocks of variable floors: four-storey block 1, a different block 2, a 3-storey block 3 and a 2-storey sports unit. Design solutions are designed in such a way that three general education blocks located at an angle of 90 ° each other and connected by the corridors are combined into one P-shaped volume. The sports unit is a separate construction, connected with a 3-float transition unit in the level of 2 floors, "Igor Solonnikov told Igor Solonnikov.

Volume-planning solutions provide for zoning of training zones initial, primary and high School. Education of primary school is carried out in block 3, training of primary and high school - in block 1, the local area of \u200b\u200bpremises in the dining room, the actual hall, the library is located in block 2, the sports area - in block 4. Education of primary school is carried out in 16 universal classes, Main and high school - in 18 study Cabinets Universal destination.

School is expected to jointly educate children with limited features Health and children who do not have such restrictions. The total number of places for children with health impairment is 5% of the school capacity. The access of small groups of the population is provided for all floors of the school. In each office, classroom, reading room, the librarian stands out 1 educational place For the disabled person moving on the wheelchair.

As the head of department clarified, according to the results of the project, the cost of construction is reduced by 10%. The amount of budget savings amounted to 127 million rubles.

In block 1 projected training classes, specialized rooms, laboratory, online club, metal and wood processing workshops, medical facilities, wildlife room. In block 2 - a dining room, an assembly hall with artistic and utility rooms, circle, reading rooms of libraries, library, library, a computer-linguistic laboratory. In block 3 - training classes of elementary school, bedrooms, extended rooms, the office of technical modeling. In block 4 - sports halls, changing rooms with shower, coaching, hall of choreography.

"A new school will appear near the village of Stolbovo, in the center of residential building. When developing the project, the possibility of joint training of children with disabilities in the general school program was envisaged. All school premises are adapted for this, the entrance to the building is designed with a zero mark. Today, on the instructions of the mayor Sergey Sobyanina, the practice of inclusive education is maximally expanded, and we will have to take care that all children be equally comfortable to learn, "commented Sergey Kuznetsov.

The school building is functionally divided into two blocks, interconnected by the transition. The largest - training case of a variable floor from 1 to 4 floors. In addition to classes, there will be sports halls and medical offices, as well as workshops of labor learning. The entrance lobby and the dining room are decided to perform with stained glass glazed. In the corridors and recreations of the first floor there are niches for recreation students.

"In the roof over the premises of the library, light anti-aircraft lights of a truncated pyramidal form are designed, providing the necessary natural lighting and being interior dominant. Lanterns will be made from reinforced concrete structures, using tempered glass as outdoor glazing, and inside - triplex, - said Sergey Kuznetsov.

Facades of the school are lining with light brick, as a bright color accent, several inner walls will paint into orange.

Building area will be about 6 thousand square meters. In the school area of \u200b\u200babout 12 hectares, zones for sports, recreation and household platforms are designed, all of them are divided by age groups And among themselves.

Designer - Peak-Project LLC. Customer - GK "Peak".

In the section "Buildings":

For the social orientation of the architectural and artistic solution of the building of the secondary school.

Secondary school at 550 students

Moscow region, Leninsky district, pos. Assistricant. Lenina

Author's team: Chief Architect / High (Head) - Belarusians N.; Architects - Sultanov A., Aryasova N., Sotskova N.; Engineers - Conys S., Vedernikov D., Shabalin D., Shishkin A., Rybakov S., Leshchev D.

Design (interiors, furniture): Aralova E. (head), Architects-designers - Nikitina E., Fedotova N., Filippova O.

Chief Consultant - Director of School Garnish N.V.

Project organization: LLC "Enterprise Arka"

Construction organization: CJSC "SK" Citrmin "

Customer, Investor: CJSC "Sovzhoz named after Lenin"

For the high quality of the architecture of the school building.

School number 1329 in Troparo-Nikulino

Customer, Investor: GUP "WEZ"

For the creation of a harmonious environment for the successful adaptation of children with disabilities.

The boarding school "Absolut"

Moscow region, Serpukhovsky district, Villagemen village

Project organization: LLC "Architectors Kulish and Lipatov"

Customer, Investor: Absolute-Help Charitable Foundation

For innovative integration educational space In the planning structure of an existing building.

Deutsche Schule Seoul International "DSSI" Renovation Project

SEOUL, SOUTH KOREA

Authors: Daniel Valle Architects

For the organic inclusion in the natural landscape and social significance of the object.

Multifunctional sports and educational complex in the Olympic Village Novogorsk

Moscow region, Khimki, MKR. Novogorsk, ul. Olympic, 28.

Project organization: architecturium LLC. Workshop Vladimir Bindeman "

For creating an artistic and clear functional architecturally - planning solution to the school of the future.

Khoroshevskaya gymnasium

Moscow, ul. Marshal Tukhachevsky, 45, Corp. 2.

architects: Soldatenkova Yu.V., Dmitriev A.N., Shorin A.A., Safronova O.V., Miroshkin E.P.;

designers: Nikushkin R.V., Grimailo I.A.

Project organization: LLC "A-project.K"

Construction Organization: Concern Croste

For a bold coloristic solution in the interpretation of the architectural image of a school building.

Secondary school at 550 seats

Project organization: LLC "Lekoo"

Construction organization: GK "Gravel"

Customer, Investor: GK "Gravel"

For a rational and expressive architectural and planning solution of a typical project.

Companies School Kazan, MKP. "Seventh heaven".

Hip Khashimova E.R., creative team of the OAP, APM-2, APM-9.

For a clear functional and plastic architectural and planning solution of the educational center.

International Educational Center

Project Organization: State Unitary Enterprise TatinVestgradnproekt

For a clear functional and expressive colorful solution to the school complex.

Experimental school at 2100 seats

Moscow, Yuvao, Negasovka district, sq.11

Project organization: LLC "Global Engineering Project Group"

Construction organization: LLC "Regionpromstroy"

Customer, Investor: Kaznaya Enterprise of Moscow, Civilian Management

Construction

For delicate use of color when developing the interior branding of the children's educational center.

Federal network of general educational children's centers "Yunium"

Project Organization: Real Design / Real Design

Diplomas Union Architectors

In the "Projects" section:

For the purity of I. artistic expressiveness architectural solution Multifunctional complex.

Family Campus - primary School on 480 children and DDU for 150 children

Project organization: LLC Architectural Bureau "AB Alice"

Customer, Investor: ODPS Skolkovo

For the creation of school space as a public residential center with an expressive colorful solution.

Secondary school at 1100 seats (44th grade)

Project organization: LLC PPF "Project-Sales"

For laconicism I. artistic culture architectural solution.

Judo School named after A.S. Rakhlin

St. Petersburg, ul. Zasshin, plot South d. 29, Corp. 5, lit. BUT

Customer, Investor: Gobu Doda Sdayshor on Judo named after A.S. Rakhlin

For high quality architecture in reconstructed historical development.

Studio School during Ensemble folk dance them. Igor Moiseeva

Moscow, Tverskaya st., 30/2, p. 5-6

Project organization: Studio 44 Architectural Bureau LLC

Customer, Investor: FGKU "DSRIR" of the Ministry of Culture of the Russian Federation

For the inventiveness of the architectural solution.

Maebong Daycare Center

SEOUL, SOUTH KOREA

Architect: Daniel Valle Almagro (Director)

PROJECT ORGANIZATION: Daniel Valle Architects

For the high quality of the architectural and planning solution of the typical project.

Typical project of secondary school at 825 places

Author's team: Gap - Osipova T.V., Hypot - Saranin Yu.V. Architects - Danilchenko G.V., Maltsev I.S., Kudryavtseva N.G., Reus O.P., Korobov D.S., Stssel E.E. Designers - Ryabykin O.B., Publikov A.V., Stoyanov A.N., Bachakashvili E.G., Gainanov A.I. Visualization - Makarov M.V., Grigorevsky V.V.

Project organization: OJSC TIZHGP "Krasnodargradanproekt"

Customer, Investor: GKU "Main Department of Construction of the Krasnodar Territory"

For a rational approach in the design of a multidisciplinary educational institution.

Moscow Regional Music College. S.S. Prokofiev

pushkino, ul. Pisarevskaya, 12.

Project organization: State Unitary Enterprise of the Moscow Region "Research and Design Institute of Urban Planning"

Customer, Investor: Ministry of Construction Complex of the Moscow Region

For the purity of the architectural and planning and coloring solution.

Secondary school at 600 seats

Moscow region, Serpukhov, MKRN. Ivanovsky courtyards, ul. Heroes of Fatherland

Buraev A.V., Lazukov A.V., Makarov V.V., Shamko I.B., Bashirova R.R., Vlasova A.V.

Project organization: State state-financed organization Moscow Region "Research Institute of Complex Design"

For the innovative application of green construction standards when creating a comfortable and humane environment of a children's educational institution.

Series of exemplary projects of children's preschool institutions In the lungs of prefruitable structures according to green building standards

Project organization: LLC "Creative Workshop of architect Logvinova"

Customer, Investor: LLC Bi-Pi-Es-Bau

For a brave experimental approach to creating educational environment and artistic expressiveness of the object.

Educational complex "Smart School", Irkutsk

chief Architect of the Project - Alexey Ivanov, Chief Engineer of the Project - Alexander Zuckerman

architects - Lorenzo Mattan, Larisa Sysoeva, Alina Khairova. Specialists from the Bureau Cebra.

Project Organization: Unk Project Architectural Bureau

Before the direction of e-treatment in Minstroy Russia, please read the rules of the work of this interactive service below.

1. The consideration is made by electronic appeals in the field of competence of the Ministry of Construction of Russia, completed in accordance with the attached form.

2. The electronic circulation may contain a statement, complaint, offer or request.

3. Electronic appeals directed through the official Internet portal of the Ministry of Construction of Russia are coming to the Department of Citizens. The ministry provides an objective, comprehensive and timely consideration of appeals. Consideration of electronic appeals is free.

4. In accordance with the Federal Law of 02.05.2006 N 59-FZ "On the procedure for considering citizens' appeals Russian Federation"Electronic appeals are recorded within three days and are sent depending on the contents of the ministry in the structural divisions. Appeal is considered within 30 days from the date of registration. Electronic appeal containing questions, the decision of which is not within the competence of the Ministry of Construction of Russia, is sent within seven days The registration day to the appropriate authority or the corresponding official, whose competence includes the decision of the issues issued, with the notice of this citizen who sent an appeal.

5. Electronic circulation is not considered when:
- the absence of the name and applicant's name;
- specifying incomplete or falverate postal address;
- presence in the text of obscene or offensive expressions;
- presence in the text of the threat of life, health and property of an official, as well as members of his family;
- use when typing the text of the non-crossliner keyboard layout or only capital letters;
- the absence of punctuation marks in the text, the presence of incomprehensible abbreviations;
- The presence of a question in the text that the applicant has already been given a written response on the merits in connection with previously directed appeals.

6. The response to the applicant's appeal is sent to the postal address specified when filling out the form.

7. When considering the appeal, it is not allowed to disclose the information contained in circulation, as well as information relating to the private life of a citizen, without its consent. Information on personal data of applicants is kept and processed in compliance with the requirements of Russian legislation on personal data.

8. Appeals received through the site are generalized and submitted to the management of the ministry for information. At the most frequently asked questions, answers periodically published in the sections "for residents" and "for specialists"

Modern school projects are largely different from those that were built in the past two decades. Today, on the background of rectilinear gray concrete cases, more and more educational institutions With an unusual design and color decision that correspond to the modern generation of children.

The company "MOSPROEKT" offers various design solutions based on modern technologies and aimed at creating a comfortable and safe environment for students. Projects comply with established construction standards and safety standards.

We also offer services for school Design and other buildings and structures.

Types of school

General education

Training is organized according to the programs of the Ministry of Education and Science. Classes can be a profile study of specific items.

Private

Non-state institution S. paid learning. The programs of the Ministry of Education and Science are complemented by copyright courses from teachers.

Specialized

Designed for children with various health problems. Buildings with small classes and developing zones.

Schools - boarding schools

Institutions with a round-the-clock stay of students. In addition to learning classes include residential premises.

For additional education

The main purpose of this type is the additional development of children in sports, scientific programs, creativity.

In addition, schools differ in terms of students: up to 1000 (300, 550) students and more than 1000 (1375, 1500) students.

Typical school project - what is it?

Typical project (TP) is also called ready - this past expertise A set of project documentation with the possibility of reuse. By purchasing a copy of the customer's ready-made documents and the time and time.

What includes a project of the school building:

  • Plot master plan
  • Architectural, constructive, volume planning solutions
  • Schemes of engineering communications

More detailed composition of the project can be obtained by reference.

Standards and standards in accordance with which school projects have been completed

  • SNiP 2.08.02-89 "Public buildings and structures";
  • Sanitary and epidemiological norms and requirements;
  • Private building standards;
  • Snaps 21-01-97 (about fire safety) and 41-01-2003 (about heating, ventilation, air conditioning systems)
  • GOST with basic technical requirements;
  • decree of the Government of the Russian Federation No. 87 of 2008;
  • SP118.13330 from 2012 (Code of Rules "Design of public buildings and structures").

Project refinement and support

The selected project can be finalized by the engineers of the Mosproject company in accordance with the requirements of the customer, the conditions of operation and the development area. All changes will be made strictly in accordance with existing standards and rules.

Our specialists will help with the passage of state expertise for the final documentation. Examination can be carried out both for changed sections and for all documentation as a whole.

How to order a project

For the convenience of users, each project card provides a special order form - fill out and send to our managers.

You can also leave a request on our website or contact us by mail: and by phone: +7 449 348 29 05.

Our specialists will definitely contact you to discuss all the details.

Share with friends or save for yourself:

Loading...